Van Icon FAST & FREE DELIVERY. UK MAINLAND ONLY. WE SHIP ABROAD
Call us Call us: 01205 821 796

Arts Center in London

21/09/2018

Back in March a customer came to us because he needed to upgrade his heating system in an arts centre in London which was previously a community centre.

We replied to Peter who is the artistic Director at Applecart Arts asking him for some more information on the property such as dimension of the rooms that need heating. Peter kindly sent over floor plans to us as well as some images of the two rooms where heating was required, the café and the main hall.

He mentioned that eventually he wanted to heat the whole building but wanted to do it in stages, which of course is not possible with other forms of heating.

After going over the floor plans we gave peter a few options of what controllers he would require, and which ranges would be best for his needs. After some further discussions over the phone Peter decided that he wanted to do a few extra rooms as well. It was decided that the most used rooms in the building should be the first to have heating.

We went over the different rooms that we could heat within the price range and we agreed on the café, female toilets, male toilets, disabled toilets, the library and two other smaller rooms.

After specifying which heaters will be needed in which areas, Peter asked us if we could calculate the running costs for him as he had heard the infrared panels are very cheap to run and wanted to see what his savings would be. We worked out the total kilowattage of the infrared system would be 9.08KW and the current gas boiler was 58.9KW. With the cost analysis the total savings worked out to be a total of around £2186.01 a year which worked out at a 59% saving!

On his original enquiry peter also mentioned that he would like the installation done by one of Warm4less’ approved installers. After working out which heaters were going where, and peter was happy with the heaters, we arranged an electrical survey to be done of the property so the installer could get a good idea of the works involved.

We presented Peter with the overall quote for the panels, controllers and installation and it was within his budget.

The deposit was paid the installation works started. The installation went smoothly with no issues and after a short 3 days, the heaters were up and running!

Peter is now really happy with his new heaters and has said it makes a huge difference from his old system. He has also left us a lovely 5-star review on our TrustPilot page.

What our customers say about us

Perfect Service. Perfect Product.

Saw their 2.4kW bar heater at Ecobuild. The looks of it are perfect even though it's used in a garage. Purchased on the spot and delivered to me two days later. Perfect service with no problems. Easy to install and very flexible to use with multiple... read more

Gavin Mackenzie

Top Class Customer Support

Really love our heating panels. We have a large one ceiling mounted above the treatment couch in our complimentary therapy clinic, and a smaller picture heater in the waiting area. All our clients love the heat generated, and it gives the clinic an e... read more

Beach Tree Clinic - Jean Senior

Brilliant and Well Beyond Expectations

Trying Warm4less Far IR Heating was the best decision I have made for ages. We are currently renting a property. Its heating system is over 50 years old and terrible. I also have an outside office building that I heat with a 3kw fan convector. I want... read more

Andrew (Dorset)

See More